General Services Administration Modifications
Anzalduas Land Port of Entry

Provided mechanical engineering to the Main Building to include design Fume Hood and Enclosure for Narcotics Processing MB 128. Plumbing Engineering for the Secondary Building (Head House) and Kennel Building to include design a water line and hose reel in KB109 at center of corridor.
Electrical Engineering to the site included design additional High Mast Lighting to comply with P-130 for site additional lighting for Kennel Area, Main Building, Inspection, and Employee Parking Areas and design mag locks at perimeter gates.Design doorbells at entry to MB152, and call boxes at Sally Port MB189 and Employee Gates.

Client: Raba-Kistner Consultants, Inc. 

AAI: 1068

<-- Back to Federal